Constructed Wetland, Gulshan-e-Iqbal Karachi Karsaz

This Project is designed and developed in Gulshan-e-Iqbal greater Karsaz areas Karachi to treat the one lake gallon wastewater and recycle for use of parks. MAKES Company has developed the plan to convert existing septic tank into Anaerobic Baffle reactor Tank (ABR) and in addition developed the other structure. The existing tank was converted in ABR with the capacity of 2.5 Gallons and developed two filters bed to treat the one lake gallon wastewater per day and in addition the 1.4 lake gallon storage tank is developed to store the treated water for onward delivery.

Following services were given during the development:

  • Construction of 5x5x10 feet grit Chamber
  • Construction of Pumping Room
  • Installation of 5 HP non clogging wastewater pump
  • Installation of 100 meters 3” dia underground delivery line from Pump house treatment unit
  • Construction of 12 Settler Tanks
  • Construction of 60 Anaerobic Baffle reactor tanks
  • Construction of two filters bed
  • Construction of 1.4 lake gallon capacity collection tank
  • Installation of 50 meter 6” dia underground overflow line to recharge the lake
  • Construction of 1000 cft PCC Inspections paths